CBK HYDRO POWER PROJECT -Lumban, Laguna
DESCRIPTION:
This hydro power project is 104 kms from Manila. Contracted works include the construction of the New Caliraya Dam & Spillway, the rehab of  Botocan hydro electric power plant, rehab of various existing tunnels and construction of various access roads..
CLIENT: CP-CBK Consortium


BACUN AC HYDRO POWER PROJECT -Benguet and Ilocos provinces
DESCRIPTION:
9.6 Kilometer tunnel including excavation, linings, de-sander chambers and transitions
CLIENT: TRANSFIELD PHILIPPINES INC. for Luzon Hydro Corporation


BAKUN AC HYDRO POWER PROJECT
DESCRIPTION:
Installation of 1,266 meters, 2.10 meters diameter Steel Liners of 9.6 km. tunnel
CLIENT:LUZON HYDRO.
Putzmeister concrete pumps set a new record pumping concrete of over 1,300 meters (the longest distance in South East Asia) to install 1,266 meters of 2.10m diameter steel liners at Sta. Clara International Corporation's US $30 Million 9.57 km tunneling project for the Bakun Hydro Power Project in Benguet, Ilocos Sur and La Union. This record setting Sta. Clara Project has a Super High Pressure Putzmeister BSA 2110 HPD used as a workhorse and BSA 1409D for cleaning pipelines.


 

 