| BAKUN
AC HYDRO POWER PROJECT
DESCRIPTION:
Installation of 1,266 meters, 2.10 meters diameter Steel
Liners of 9.6 km. tunnel
CLIENT:LUZON HYDRO.
Putzmeister concrete pumps set a new record pumping
concrete of over 1,300 meters (the longest distance
in South East Asia) to install 1,266 meters of 2.10m
diameter steel liners at Sta. Clara International Corporation's
US $30 Million 9.57 km tunneling project for the Bakun
Hydro Power Project in Benguet, Ilocos Sur and La Union.
This record setting Sta. Clara Project has a Super High
Pressure Putzmeister BSA 2110 HPD used as a workhorse
and BSA 1409D for cleaning pipelines.

|