PAJO BRIDGE - Alfonso, Cavite
DESCRIPTION:
A short span of concrete bridge, 27.9 meters long x 9.54 meters wide. It includes the construction of 82.10 meters x 8.2 meters approach road, drainage system, river bank  and slope protection works.
CLIENT:Toyo-Tobishima joint venture (Project of DPWH)


CATMON BRIDGE - Alfonso, Cavite
DESCRIPTION:
A short span of concrete bridge, 20 meters long x 9.54 meters wide. It includes the construction of 144 meters and 8.2 meters approach road with drainage system, river bank and slope protection works.
CLIENT:Toyo-Tobishima joint venture (Project of DPWH)


LIPA BRIDGE- Indang, Cavite
DESCRIPTION:
A short span of concrete bridge, 20.20 meters long x 9.54 meters wide. It includes the construction of 98.3 meters x 9.10 meters approach road, drainage system, river bank and slope protection works.
CLIENT:Toyo-Tobishima joint venture (Project of DPWH)


CAVINTE BRIDGE -Cavinti, Laguna
DESCRIPTION:
A short span of concrete bridge, 40 meters long x 9.54
meters wide and steel girder. It includes the construction of 118 meters x 9.1 meters approach road, drainage system, river bank and slope protection works. 
CLIENT:Toyo-Tobishima joint venture (Project of DPWH)


MABACAO BRIDGE - Mabacao, Maragondon, Cavite
DESCRIPTION:
A 3 span of concrete bridge, 88 meters long x 54 meters wide and steel girder.  It includes the construction of 183 meters x 9.10 meters approach road, drainage system,  river bank and slope protection works.
CLIENT:TOYO - TOBISHIMA JOINT VENTURE (PROJECT OF DPWH)


SBMA TIPO ROAD - Olongapo City -Hermosa, Bataan
DESCRIPTION:
Construction of 8.5 km. of 7.30 m wide expressway including bridge and border fencing
CLIENT:
SAMSUNG CONSTRUCTION CO. PHIL. INC.

ELIZABETH BRIDGE - Salug, Leyte
DESCRIPTION:
Concrete 3-span bridge, 81m length X 8.30m width on piled foundation and steel girder. Also 240m X 6.70m width approach road and riverbank and slope protection
CLIENT: TOYO CONSTRUCTION CO. LTD. for Department of Public Works & Highways

TAMBONGON BRIDGE - San Remegio, Cebu City
DESCRIPTION:
Concrete 3-span bridge, 82.8m length X 8.30m width on piled foundation and pre-stressed concrete girder. Also 240m x 6.70m width approach road and riverbank and slope protection
CLIENT: TOYO CONSTRUCTION CO. LTD.
for Department of Public Works & Highways


ALIMANGO BRIDGE - Cantabaco, Toledo City, Cebu
DESCRIPTION:
Concrete 2-span bridge, 35m length X 8.30m width on spread footing foundation and steel girder. Also 250m X 6.70m width approach road and slope protection
CLIENT: TOYO CONSTRUCTION CO. LTD. for Department of Public Works & Highways

MOJON BRIDGE - Talisay, Cebu City
DESCRIPTION:
Concrete 5-span bridge, 175m length X 8.30m width. Also 200m X 6.70m width approach road and river-bank and slope protection
CLIENT: TOYO CONSTRUCTION CO. LTD. for Department of Public Works & Highways

Home / Next

 

 

Copyright 2003 Sta.Clara International Corporation.
Created and maintained by Web Experts, Inc. This site is optimized for Netscape 4 and Internet Explorer 5 or higher.
Please download an upgraded version now.